Client: RCR Tomlinson / First Solar
Duration: 6 months
Location: Manildra, NSW
Brefni was contracted to carry out the civil works on the 55Mega Watt solar farm, located west of Orange, NSW.
Civil works included design and construction of the following:
- RMS intersection adjustments
- Provision of site amenities and offices
- Strip and reinstate topsoil (500,000m2)
- Cut & Fill operations (100,000m3)
- Design and construct a combined 15kms of heavy vehicle dual and single roads
- Construct 15kms of cable route including trenching and backfilling, laying, terminating and testing of cables
- Excavate, form, reo and pour foundations for associated electrical equipment