Brefni was contracted to carry out the civil works on the 330MW solar farm, located on 2000 acres of land in the Murrumbidgee region of NSW.

Client: Signal Energy Australia Pty Ltd

Duration: 6 months

Location: Darlington Point, NSW

Brefni was contracted to carry out the civil works on the 330MW solar farm, located on 2000 acres of land in the Murrumbidgee region of NSW.

Civil works included design and construction of the following;

  • Local council road upgrades to allow truck access to the project
  • Tree clearing and vegetation
  • Earthworks cut to fill operation
  • Foundation improvement due to poor ground conditions
  • Lay down area
  • 34kms of access road construction on site
  • Produced 40kms of fire barrier accessible zone
  • Overland waterflow management
  • Ongoing support during electrical and mechanical works