b"SMARTER, SHARPERCASE STUDY NO. 5 Flemington Station Concourse and Bridge Demolition This repeat project, workingThis project involved the demolition of existing concourse buildings and canopies over a number of platforms, encompassing services relocation; closely with Laing ORourkethe construction of new covered and uncovered concourses, footbridges, lifts, and Sydney Trains, is a clearstairs and platform canopies; and the refurbishment of existing platform example of Brefnis diverse railbuildings (toilets, station offices, staff facilities and communication capability.equipment rooms). In addition to platform resurfacing, Brefni completed a number of electrical and ATV works, including station power supply upgrades, lighting Client: Laing O'Roukeadjustments, augmentation of station communication systems, and Value: $5 millionmodifications to passenger information systems and ticketing. Duration: 6 monthsInterfacing with utilities providers and external stakeholders This project required Brefni to work with a number of system operators for Relevant featureselectrical, station communication and ticketing systems works to ensure correct programming, smooth commissioning and effective integration MULTIPLE STATIONSwith existing systems. Key external stakeholders included local council, Transport for NSW, Sydney Trains and Laing ORourke. All works completed within 48 hours STAKEHOLDERMANAGEMENTThese works were completed during a 48-hour rail closedown. Detailed planning and sequencing, contingency planning and go/no go workshops with the client ensured all risks were identified and a plan was in place to SERVICES RELOCATIONSdeal with anything that eventuated. Works were completed four hours ahead of program, allowing early hand back of the track. Detailed demolition sequence ensured structural integrity at all times Brefni managed the temporary works and detailed demolition sequence to ensure the structure maintained integrity at all times during the demolition.BREFNI|15"