Client: Downer EDI Engineering
Duration: 6 months
Location: Port Botany, NSW
As part of the Port Botany expansion plan Befni was engaged by Downer EDI Engineering to construct the building shell to enable electrical fitout by Downer.
The works involved construction of the complete building including:
Dewatering and temporary works of the site
Construction of basement and water proofing
Construction of suspended concrete floor and beams
Construction of concrete block wall shell
Construction of structural steel roof
Fireproofing
Fitout of core
High security fencing
Upgrade staff carpark