Darlington Point Solar Farm
Client: Signal Energy Australia Pty Ltd Duration: 6 months Location: Darlington Point, NSW Brefni was contracted to carry out the civil works on the 330MW solar farm, located on 2000...
Client: Signal Energy Australia Pty Ltd Duration: 6 months Location: Darlington Point, NSW Brefni was contracted to carry out the civil works on the 330MW solar farm, located on 2000...
Client: Sydney Trains Duration: 12 months Location: Lambton Road, Broadmeadow In 2017, Brefni commenced refurbishment works for Sydney Trains on the Lambton Road Overbridge, located in Broadmeadow, NSW. This line carries some...
Client: Signal Energy Australia Pty Ltd Duration: 6 months Location: Finley, NSW Brefni was contracted to carry out the civil works on the 175MW solar farm, located on 1000 acres...
Client: Wollongong City Council Duration: 6 months Location: Russell Vale, NSW Brefni undertook the reconstruction of a retaining wall in Russell Vale on the Princes Highway from Hicks Street to...
Client: Laing O’Rourke Duration: 8 months Location: Randwick, NSW Due to the construction of the Sydney Light Rail an 8,000m2 at grade carpark was constructed at Randwick Racecourse. This was...
Client: Acciona Duration: 6 months Location: Randwick, NSW Brefni were engaged by Acciona to reconfigure the intersection at Alison Road and Darley Road, Randwick. This intersection was redesigned to accommodate the...
Client: Crown Projects Duration: 9 months Location: Milperra, NSW Brefni were engaged by Crown Projects on behalf of Flower Power to complete the early works on their new flagship store...
Client: RCR Tomlinson / First Solar Duration: 6 months Location: Manildra, NSW Brefni was contracted to carry out the civil works on the 55Mega Watt solar farm, located west of...