Roger Summers Reserve 2017-09-26T23:12:26+00:00

Project Description

Roger Summers Reserve

Client: Sutherland Shire Council
Value: $1.65M
Location: Bundeena
Duration: 6 Months
Commencement: November 2016
Overview:
This Project required a lot of planning since it was in the town of Bundeena and not accessible to the local market sub-contractors and suppliers. The road leading to the project was through a national park. The construction of the revetment wall was carried out during low tide and hence the timing and planning played a vital role in the execution.

Scope of works:

The works consists of:
• Construction of a 2m x 0.5m x 0.5m sawn revetment wall.
• Over Head HV Electrical reticulation.
• Construction of elevated footpath on grout injected piles with anodised metal work.
• Associated landscape and pathways.
• Beach users Open Shower.