Randwick Racecourse 2017-09-24T23:56:36+00:00

Project Description

Randwick Racecourse – Temporary Car Park

Client: Laing O’Rourke
Value: $3M
Location: Randwick Racecourse
Duration: 6 Months
Commencement: October 2015
Overview:
Construction of a temporary car park at Randwick Racecourse

Scope of works:
The works consists of
• Installation of drainage system up to and including pit connecting to pipe jacking section of system
• Earthworks, including bulk cut / fill, subgrade trim, base and subbase installation with associate geotechnical and conformance testing
• Trim operations and conformance survey with report in 10 x 10m grid minimum and at all break points such as crowns, pavement edges and drainage/ service pits
• Paving, kerbing, line marking